Monday 19 July 2010

Tanks For The Memory

As an unmemorable World Cup fades into the past, life at the Blackwall Lane brewery construction site is now focused, once more, on completion of the largest new brewery investment in London since Guinness built their Park Royal plant in 1933.
Sine our last bulletin more vessels have arrived, including new 200 Hl fermenters and maturation vessels, and a lattice of stainless steel pipe-work continues to snake ever more intricately around the newly painted walls of the brewhouse.

Pipes in a brewery invariably end in valves and given the size of the brewery there are only two methods of managing the large numbers of valves needed. You can either train octopuses to brew, or  - since no textbooks actually recommend this - you can automate the brewhouse.

Accordingly the pipe-work has to be matched by control systems, so a parallel network of cabling is being installed and linked into the computer system that will control the whole brewhouse. The octopuses will therefore be kept purely for backup purposes.

No comments:

Post a Comment